Unpacking

Products:

Untitled

Additional equipment (not included):

Untitled

Untitled

Untitled

Untitled

Ethernet cable Cat5

Ethernet RJ45 connectors (UTP, Cat 5е, 8P8C)

Ethernet RJ45 Sockets (Cat 5e)

Tools for mounting sensors

Sensor installation information

FOV (Field of View) of the sensor

Untitled

Untitled

Number of Sensors

To ensure accurate space tracking and measurement, you need to install the right amount of Friday PM sensors above that space with respect to its FOV. (The sensor is designed for indoor use only)

Untitled

Sensors location

Untitled

To ensure full coverage of the space where more than one sensor is required, they should be installed with the overlap of their FOV’s.


It is recommended to install sensors in arrow checkerboard order.

Untitled